Design Build Projects as
recorded in ODOT Ellis computer system |
|
|
Last Updated: |
8/23/2007 |
|
Query: Design Builds for
Dan Groh |
|
Updated Date: |
8/23/2007 11:18 |
|
|
|
|
Award Date Priority FY |
District |
PID |
Project Name (ie CRS) |
Primary Work Category |
Project Desc1 Txt |
Award Date Priority Date |
Contract Feature Name |
SUM Sale Amount |
SUM Adjusted Total Amt |
|
|
8 |
83047 |
Pre TR259/329 Des Build Br Rep |
Bridge Replacement |
Junction Road (TR 259) Replace
S.D. steel truss bridge Ketterman Road (TR 329) Replace S.D. bridge with
minimal approach work |
|
Design Build 1 |
|
$
406,000.00 |
|
1998 |
7 |
8410 |
CLA US 68 12.52 |
New Construction |
CONSTRUCT A CONNECTION BETWEEN
CLA-68-15.19 AND CHP-68-0.00, TO BETTER
UTILIZE EXISTING L/A SECTION OF ROADWAY. DESIGN & BUILD PROJECT. |
5/23/1998 |
Design Build 1 |
|
$ 19,389,882.44 |
|
2000 |
3 |
18200 |
MED IR 0271 00.00 |
Major Reconstruction |
PAVEMENT RECONSTRUCTION DESIGN
BUILD PROJECT |
3/7/2000 |
Design Build 1 |
|
$ 22,247,042.21 |
|
2000 |
4 |
18703 |
ATB SR 0045 19.92 |
Bridge Replacement |
WIDENING OF BRIDGE ATB-45-19.92
OVER IR 90. DESIGN/BUILD. HIGH PRIORITY PROJECT MAX $1,555,082. |
3/22/2000 |
Design Build 1 |
|
$
3,133,281.08 |
|
2000 |
4 |
20411 |
STA IR 0077 11.59 |
Major Reconstruction |
MAJOR UPGRADE TO INCLUDE
MODIFICATIONS TO MAINLINE, RAMPS, SERVICE ROADS AND BRIDGES. ADD LANE BOTH
DIRCTIONS; CONSTRUCT FOR 12874; TRC ON DIST BRIDGE ONLY. DBrelates to pids
20410, 20412, 10769 |
5/23/2000 |
Design Build 1 |
|
$ 26,502,862.08 |
|
2000 |
6 |
20681 |
FRA IR 71 14.39 |
Major Reconstruction |
IR71: PARTIAL AND FULL DEPTH
PAVT REPAIR PAVT INLAY. SR315: REMOVE/REPLACE PAVT A ND SUBBASE, CURB,
INLETS. REPLACE CONC BARRIER, LIGHTS, SIGNS, GUARDRAIL. D/B. |
4/20/2000 |
Design Build 1 |
|
$
3,758,870.58 |
|
2000 |
7 |
11160 |
MIA IR 75 4.94 |
Major Widening |
ADD ADDITIONAL LANES AND
RECONSTRUCT EXISTING ROADWAY, UPGRADE ALL STRUCTURES AND PROVIDE 16'6"
VERTICAL CLEARANCE. REMOVE MIA-75-0733L&R.* MNC MAX $18MIL. |
2/10/2000 |
Design Build 1 |
|
$ 53,039,591.83 |
|
2000 |
8 |
18899 |
PRE IR 70 0.00 |
Minor Rehabilitation - Pavement
Prmy Sys |
PROJECT CONSISTS OF PLANING,
SUPERPAVING, INSTALL RAISED PAVEMENT MARKERS, WIDENING MAINLINE BRIDGES, AND
PAINTING 12 INTERSTATE BRIDGES.
DESIGN/BUILD. COMBINED WITH PIDS 19391 AND 19411. |
3/22/2000 |
Design Build 1 |
|
$ 22,532,459.99 |
|
2001 |
1 |
21082 |
ALL US30 18.18 |
Bridge Repair |
REPLACE DECKS ON STRUCTURES
OVER IR75 AND NORFOLK SOUTHERN R.R. MICRO-SILICA OVERLAY DECKS ON STRUCTURES OVER NAPOLEON
ROAD. NO R/W REQ'D. DESIGN BUILD. |
10/5/2000 |
Design Build 1 |
|
$
2,588,297.00 |
|
2001 |
3 |
17891 |
LOR IR 0090 10.76 |
Resurfacing, Divided System |
4-LANE RESURFACING & BRIDGE
DECK OVERLAY INCL. ADD A LANE SR611 TO EXIST 6-LANE ENVIRONMENTAL CLEARED
WITH PID 11385 DESIGN BUILD PROJECT |
12/7/2000 |
Design Build 1 |
|
$ 17,874,111.11 |
|
2001 |
4 |
18722 |
MAH SR 0011 16.04 |
Bridge Replacement |
MAJOR BRIDGE WORK ON MAH. SR 11
- 16.04 L, SB OVER I80 EB AND MAH. SR 11 - 16.15 L, SB OVER I 680 WB RAMP
& SR 11-16.05L OVER IR80 EB.COMBINED W/CANCEL PID 19322 |
2/1/2001 |
Design Build 1 |
|
$
4,525,848.00 |
|
2001 |
4 |
19854 |
POR US 0224 00.00 |
Resurfacing, Undivided System |
TWO LANE RESURFACING FROM
SUMMIT CO. TO SR183.SAFETY IMPRV. BY ADDING TURN LANE TO MARTIN, CONGRESS
LAKE AND WATERLOO INTERSECTION. DESIGN BUILD PROJECT. |
5/3/2001 |
Design Build 1 |
|
$
4,103,657.00 |
|
2001 |
4 |
19899 |
ATB SR 0011 23.33 |
Bridge Repair |
REDECK, ABUT. CARSON ROAD OVER
SR 11. DESIGN BUILD PROJECT. |
3/1/2001 |
Design Build 1 |
|
$
680,958.50 |
|
2001 |
4 |
22163 |
TRU IR 0080 09.08 |
Resurfacing, Divided System |
4 LANE RESURFACING WITH
BRIDGEWORK. |
2/26/2001 |
Design Build 1 |
|
$
5,450,099.98 |
|
2001 |
8 |
12412 |
HAM IR 471 0.26 |
Minor Rehabilitation - Pavement
Prmy Sys |
MAJOR REHABILITATION OF
EXISTING PAVEMENT AND SAFETY UPGRADE.
0.47 MILES DESIGN BUILD PROJECT |
3/1/2001 |
Design Build 1 |
|
$ 16,968,439.98 |
|
2001 |
8 |
19705 |
HAM IR 71 11.08 |
Resurfacing, Divided System |
PROJECT CONSISTS OF PLANING AND
RESURFACING AND INSTALLING PAVEMENT
MARKINGS.CLOSURE OF NOISE WALL GAPS.
PAINT AND LANDSCAPE EXISTING WALLS. |
3/22/2001 |
Design Build 1 |
|
$ 12,218,759.99 |
|
2001 |
8 |
19786 |
HAM IR 275 32.27 |
Resurfacing, Divided System |
PROJECT CONSISTS OF PLANING,
RESURFACING, PAVEMEMT MARKINGS AND STRUCTURAL STEEL RETROFIT, OVERLAY AND NEW
PARAPETS FOR MAINLINE BR. OVER GREAT MIAMI RIVER |
11/16/2000 |
Design Build 1 |
|
$ 32,563,632.69 |
|
2001 |
10 |
21053 |
ATH US 33 10.41 |
Bridge Repair |
BRIDGE DECK REHABILITATION.
INCLUDES ATH-33-10.41R. DETOUR APPLICATION REQUIRED. DESIGN BUILD. |
2/26/2001 |
Design Build 1 |
|
$
1,992,900.00 |
|
2001 |
11 |
12761 |
TUS IR 77 3.94 |
Resurfacing, Divided System |
4-LANE MAJOR RHABILITAION -
RUBBLIZE AND ROLL; SIGNING, LIGHTING, FENCING, GUARD- RAIL, MODIFY OR REPAIR
5 BRIDGES. DESIGN BUILD. |
2/15/2001 |
Design Build 1 |
|
$
9,652,699.99 |
|
2002 |
1 |
21490 |
HAR SR 81 16.54 |
Bridge Repair |
REPLACE DECK ON STRUCTURE OVER
THE BLANCHARD RIVER. |
10/11/2001 |
Design Build 1 |
|
$
366,250.00 |
|
2002 |
1 |
23567 |
ALL CR 88 0.36 |
Major Widening |
WIDEN EXISTING ROADWAY TO THREE
LANES TO PROVIDE FOR A TWO WAY LEFT TURN LANE FROM WEST OF GRONE RD. TO EAST
OF LEHMAN RD. FEDERAL MAX $116,500 |
3/11/2002 |
Design Build 2 |
|
$
240,294.04 |
|
2002 |
2 |
22516 |
HEN SR 108 15.61 |
Bridge Repair |
REHAB EXISTING BRIDGE BY
REPLACING PARAPETS, SIDEWALKS & WEARING SURFACE; PATCH CONC SPANDRAL
WALLS AS REQUIRED; PERFORM NECESSARY
RELATED WORK. DESIGN-BUILD |
12/20/2001 |
Design Build 1 |
|
$
1,064,490.00 |
|
2002 |
5 |
22587 |
PER CR0057 05.600 |
Bridge Replacement |
REPLACE 4 BRIDGES. INCLUDES PID
21426. |
5/9/2002 |
Design Build 1 |
|
$
757,220.00 |
|
2002 |
5 |
22627 |
GUE CR0073 00.000 |
Bridge Replacement |
REPLACE 6 BRIDGES |
5/6/2002 |
Design Build 1 |
|
$
607,788.00 |
|
2002 |
7 |
19669 |
MOT SR 4 4.83 |
Bridge Replacement |
REPLACE 28FT STRUCTURE OVER DRY
RUN WITH MINIMAL APPROACH WORK. CLEAR
SPAN = 25 FT |
12/28/2001 |
Design Build 1 |
|
$
365,560.00 |
|
2002 |
7 |
24375 |
MER CR 22 1.32 |
Bridge Replacement |
REMOVE THREE EXISTING BRIDGE
AND ASSOC. ROADWAY APPROACH PAVT.
CONSTRUCT NEW PRECAST CONCRETE BOX BRIDGES AND ASSOC. ROADWAY APPROACH.
DESIGN/BUILD. |
4/23/2002 |
Design Build 1 |
|
$
404,590.00 |
|
2002 |
8 |
21713 |
PRE US 40 1.33 |
Bridge Replacement |
REPLACE BRIDGE NO. PRE-40-0133
OVER TRIBUTARY OF THE EAST FORK OF THE
WHITEWATER RIVER. DESIGN BUILD
PROJECT |
9/13/2001 |
Design Build 1 |
|
$
266,540.00 |
|
2002 |
8 |
24434 |
PRE TR 444 0.80 & VAR DB |
Bridge Replacement |
REPLACE THREE EXISTING TRUSS
BRIDGES (TR444-.80 TR453-1.25, AND
TR409-1.60) AND REPLACE EXISTINGSTEEL
BEAM BRIDGE (CR56-.60) DESIGN BUILD
PROJECT. |
4/26/2002 |
Design Build 1 |
|
$
1,695,745.71 |
|
2003 |
1 |
24297 |
PAU CR 111 4.65 |
Bridge Repair |
REHABILITATE TWO EXISTING
STRUCTURES BY REPLACING THE EXISTING DECKS. THIS WILL BE A DESIGN BUILD
PROJECT. |
6/19/2002 |
Design Build 1 |
|
$
540,955.35 |
|
2003 |
1 |
24518 |
HAN CR 8 4.85 |
Bridge Replacement |
REPLACE 6 EXISTING STRUCTURES
IN HANCOCK COUNTY WITH NEW STRUCTURES. THIS WILL BE A DESIGN BUILD PROJECT. |
9/26/2002 |
Design Build 1 |
|
$
818,520.00 |
|
2003 |
3 |
24442 |
HUR CR 0124 01.880 |
Bridge Replacement |
DESIGN BUILD PROJECT ON TR91
(TERRY RD) OVER THE HURON RIVER AND ON CR241 (WASHINGTON RD) OVER A BRANCH OF
THE HURON RIVER |
3/4/2003 |
Design Build 1 |
|
$
838,081.40 |
|
2003 |
4 |
18718 |
SUM SR 0021 01.79 |
Bridge Repair |
REHAB ONE STRUCTURE ON SR21 IN
SUMMIT CO INCLUDES PIDS 18719 AND 13337. |
12/2/2002 |
Design Build 1 |
$
999,400.00 |
$
1,157,910.00 |
|
2003 |
4 |
19791 |
STA IR 0077 00.00 |
Resurfacing, Divided System |
FOUR LANE RESURFACING/UPGRADING
FROM TUSCARAWAS COUNTY TO CANTON CORPORATION LIMIT. INCLUDING WORK ON 5 BRIDGES |
11/27/2002 |
Design Build 1 |
$
4,764,330.00 |
$
5,278,263.00 |
|
2003 |
4 |
22174 |
ATB SR 0011 25.16 |
Bridge Repair |
REDECK STRUCTURE, MAKE
STRUCTURAL STEEL CONTINUOUS AND PAINT STRUCTURAL STEEL ON THE LEFT AND RIGHT
PARTS OF THE BRIDGE |
9/27/2002 |
Design Build 1 |
$
9,259,925.00 |
$ 10,487,720.00 |
|
2003 |
4 |
22229 |
SUM IR 0077 15.47 |
Bridge Repair |
REDECK/PAINT BRIDGE UNDER
STONER ST. OLD PID 19922 |
10/3/2002 |
Design Build 1 |
$
1,410,800.00 |
$
1,643,730.00 |
|
2003 |
4 |
23672 |
SUM Main Street |
Major Reconstruction |
DECK REPLACEMENT AND RELATED
IMPROVEMENT.DESIGN-BUILD PROJECT. |
5/5/2003 |
Design Build 1 |
$
4,829,681.00 |
$
5,921,548.77 |
|
2003 |
4 |
23929 |
TRU SR 0011 09.08 |
Lighting |
INSTALL INTERCHANGE LIGHTING
FOR SR82 AT SR11 INTERCHANGE, ALSO RESURFACE THE INTERCHANGE INCLUDING ALL
RAMPS WITH SKID-RESISTANT MATERIAL |
12/30/2002 |
Design Build 1 |
$
2,067,500.00 |
$
2,453,152.10 |
|
2003 |
4 |
24038 |
ATB CR 0020 00.02 |
Bridge Replacement |
REPLACE A 3 SPAN 60FOOT BY
116FOOT BY 50FOOT PRATT TRUSS BRIDGE OVER NORFOLK & SOUTHERN RAILROAD
(PLYMOUTH RIDGE ROAD) |
12/12/2002 |
Design Build 1 |
|
$
865,977.00 |
|
2003 |
4 |
24447 |
POR CR 0176 00.17 |
Bridge Replacement |
BRIDGE REPLACEMENT. DESIGN
BUILD PROJECT |
5/29/2003 |
Design Build 1 |
|
$
203,039.90 |
|
2003 |
4 |
24663 |
TRU CR 0302 02.40 |
Bridge Replacement |
(DONLEY ROAD) REPLACE EXISTING
BRIDGES OVER SWINE CREEK & BRAND RIVER |
5/21/2003 |
Design Build 1 |
|
$
504,636.98 |
|
2003 |
5 |
19821 |
GUE IR 77 07.68 |
Bridge Repair |
DECK REPLACEMENT AND PAINTING
ON TWO BRIDGES / DESIGN BUILD LANDSCAPING TE FUNDS |
12/20/2002 |
Design Build 1 |
$
3,994,220.00 |
$
2,120,800.00 |
|
2003 |
5 |
24369 |
COS SR 16 07.18 |
Culvert
Construction/Reconstr/Repair |
Replace 2 culverts/1 bridge
using the ODOT Design Build PolicyCos-16-7.18 = From SR 16E: SR 83S to
CR-271E to Second Street E to SR 541N to SR 16ELic-13-17.11 = From SR 13N to
TR-76 (Weaver Rd) to TR-75 (Preston Rd) to TR-105 (Joseph Rd) to SR
13Gue-821-0 |
1/21/2003 |
Design Build 1 |
$
962,304.00 |
$
637,624.80 |
|
2003 |
6 |
12769 |
PIC US 22 16.96 |
Bridge Repair |
REHAB 633FT BRIDGE OVER SCIOTO
RIVER WITH SHORT APPROACH AND APPROACH GUARDRAIL. DESIGN/BUILD FAST TRACK
CONST |
12/17/2002 |
Design Build 1 |
$
2,724,570.00 |
$
4,159,619.00 |
|
2003 |
6 |
23948 |
UNI CR 23 02.070 |
Bridge Replacement |
CEAO DESIGN/BUILD PROJECT TO
REPLACE TWO STRUCTURES ON CR23 AND CR213. PREVIOUSLY PROGRAMMED AS 2 SEPARATE
PIDS; PID 23949 (CR213) COMBINED WITH THIS PID. |
9/3/2002 |
Design Build 1 |
$
641,441.00 |
$
832,293.90 |
|
2003 |
6 |
23997 |
FRA IR 270 1.52 |
Noise Wall |
CONSTRUCTION OF TYPE2
(RETROFIT) NOISE WALL. DESIGN/BUILD. |
2/20/2003 |
Design Build 1 |
|
$
617,000.00 |
|
2003 |
7 |
24384 |
DAR SR 705 11.02 |
Bridge Replacement |
REPLACE A 27FT STRUCTURE OVER
BRANCH OF MILE CREEK WITH MINIMAL APPROACH WORK. DESIGN/BUILD. |
10/3/2002 |
Design Build 1 |
$
215,850.00 |
$
252,070.00 |
|
2003 |
8 |
21019 |
BUT TR 175 0.51 |
Bridge Replacement |
REPLACE TWO DEFICIENT
STRUCTURES. COUNTY DESIGN BUILD
PROJECT. |
9/5/2002 |
Design Build 1 |
|
$
1,063,292.46 |
|
2003 |
10 |
24446 |
MEG CR0028 06.240 |
Bridge Replacement |
BRIDGE REPLACEMENT PROJECT
USING THE DESIGN/BUILD PROCESS. INCLUDES MEG- CR029-0268. |
6/28/2002 |
Design Build 1 |
|
$
292,900.00 |
|
2003 |
11 |
20996 |
TUS IR 77 7.55 |
Resurfacing, Divided System |
4 LANE MAJ REHAB-RUBBLIZE
&ROLL;SIGNING GUARDRAIL,REPAIR 5 BRIDGES. SIGNING IN CLUDED 00.00-3.88SECTION |
12/30/2002 |
Design Build 1 |
|
$
8,853,710.00 |
|
2003 |
12 |
24356 |
CUY SPAFFORD ROAD |
Bridge Replacement |
REHAB SPAFFORD RD BRIDGE #23
OVER E.BRCH OF ROCKY RIVER IN BROOK PARK AND OLMSTED TWP LOCAL,
NON-TRADITIONAL, DESIGN BUILD |
7/1/2002 |
Design Build 1 |
|
$
938,885.00 |
|
2003 |
12 |
24364 |
LAK RAVENNA ROAD /VARIOUS |
Bridge Replacement |
REPLACE BRIDGES: RAVENNA ROAD
OVER KELLOG CREEK / CUNNINGHAM ROAD OVER ARCOLA CREEK / PINEHILL ROAD OVER
ELLISON CREEK IN MADISON & CONCORD TOWNSHIPS. LOCAL, NON-TRADITIONAL,
DESIGN-BUILD |
7/1/2002 |
Design Build 1 |
|
$
1,367,647.34 |
|
2004 |
1 |
21607 |
HAN SR 37 10.81 |
Bridge Repair |
REHABILITATE EXISTING STRUCTURE
OVER THE BLANCHARD RIVER BY REPLACING THE DECK, BACKWALLS AND APPROACH SLABS. |
12/16/2003 |
Design Build 1 |
$
452,281.00 |
$
528,510.00 |
|
2004 |
2 |
24102 |
SEN SR 67 9.87 |
Resurfacing, Undivided System |
2-LANE RESURFACING WITH
PAVEMENT REPAIRS AS NEEDED (Cold in
Place recycling); PERFORM NECESSARY RELATED WORK. |
10/3/2003 |
Design Build 1 |
$
1,648,255.00 |
$
1,808,106.00 |
|
2004 |
2 |
75172 |
D02-SIGN-FY2004(A) |
Signs |
District wide sign upgrade;
perform necessary related work |
11/26/2003 |
Design Build 1 |
$
334,500.00 |
$
364,850.00 |
|
2004 |
6 |
75280 |
FRA IR 270 20.03 |
Noise Wall |
Construct noisewalls along both
sides of I-270 to fulfill commitments made when I-270 was widened to four
lanes in each direction. Noise
abatement for PIDs-12505, 12504, 12494, and 12495. |
4/5/2004 |
Design Build 1 |
$
7,246,000.00 |
$
7,981,600.00 |
|
2004 |
7 |
19670 |
MOT SR 48 5.16 |
Bridge Replacement |
REPLACE 21FT STRUCTURE OVER
TRIBUTARY TO HOLES CREEK WITH MINIMAL APPROACH WORK. ELIMINATE GUARDRAIL.
CLEAR SPAN = 19FT. |
10/30/2003 |
Design Build 1 |
|
$
339,730.00 |
|
2004 |
11 |
19572 |
D11 Sign FY2004A |
Signs |
REPLACE OR EPOXY SEAL OVERHEAD
SIGN SUPPORT STRUCTURES IN COL, HAS,
JEF AND TUS COUNTIESUpgrade existing signs including all interchanges and
intersections on Has-22 and Jef-22 locations.
Includes Hopedale. |
10/30/2003 |
Design Build 1 |
|
$
595,330.00 |
|
2004 |
11 |
19575 |
D11 Sign FY2004 B |
Signs |
UPGRADE EXISTING SIGNS
INCLUDING ALL INTERCHANGES ON IR 470 |
10/30/2003 |
Design Build 1 |
|
$
571,642.00 |
|
2005 |
6 |
75279 |
FRA/DEL IR 71 25.36/1.16 |
Noise Wall |
Construct noise walls along
both sides of I-71 to fulfill environmental commitments when I-71 was widened
(under PID-7278). |
6/16/2005 |
Design Build 1 |
$
8,574,500.00 |
$
9,502,100.20 |
|
2005 |
6 |
76564 |
FAY SR 41 22.18 |
Bridge Repair |
REPLACE DECK WITH A WIDER
(THREE LANE) DECK AND APPROACH WORK FOR FUTURE WIDENING OF SR 41.
DESIGN/BUILD PROJECT. |
12/3/2004 |
Design Build 1 |
$
2,133,700.00 |
$
2,470,062.00 |
|
2005 |
7 |
25295 |
MER SR 117 9.31 |
Bridge Replacement |
REPLACE TWO BRIDGES. DESIGN BUILD PROJECT. |
10/4/2004 |
Design Build 1 |
|
$
445,408.00 |
|
2005 |
10 |
76160 |
WAS IR 77 6.59 |
Major Rehabilitation |
Four-lane major rehabilitation
project. WAS IR 77 6.59-17.59 and NOB
IR 77 0.00-1.56. Includes WAS IR 77
11.53 LT and WAS IR 77 12.08 RT bridges.
PID's now combined with this job are: 76239 (WAS 77 10.90 and NOB 77
0.13 Landslide locations) and 21857 ( |
2/10/2005 |
Design Build 1 |
|
$ 22,149,941.80 |
|
2006 |
4 |
23703 |
STA US 0062 08.32 |
Bridge Repair |
REDECK AND PAINTING OF ONE
STRUCTURE.Design/Build. |
12/22/2005 |
Design Build 1 |
|
$
924,006.54 |
|
2006 |
4 |
25072 |
STA SR 0225 00.76 |
Bridge Repair |
REPLACEMENT OF EXISTING DECK. |
12/9/2005 |
Design Build 1 |
$
603,818.50 |
$
657,476.00 |
|
2006 |
8 |
25499 |
HAM SR 562 0.00 |
Resurfacing, Divided System |
REHABILITATE SR 562. |
10/3/2005 |
Design Build 1 |
$
5,438,809.10 |
$
5,989,885.00 |
|
2006 |
9 |
76169 |
SCI CR 15 0.12 Dixon Mill Road |
Bridge Replacement |
Replace existing deficient
bridge on Dixon Mill ROad over the Little Scioto River, Scioto County Road
15. This project is a Design Build project per the Scioto County Engineer. |
7/1/2005 |
Design Build 1 |
|
$
1,595,832.00 |
|
2007 |
9 |
76170 |
SCI CR 48 2.85 Arion Road Brdg |
Bridge Replacement |
Replace existing deficient one
lane bridge on Arion Road over Scioto Brush Creek. Scioto County Road 48. |
8/17/2006 |
Design Build 1 |
|
$
1,648,500.00 |
|
2007 |
12 |
79599 |
CUY IR 071 11.88 NOISE WALL |
Noise Wall |
Construct noise walls. |
9/14/2006 |
Design Build 1 |
|
$
6,491,319.00 |
|
2008 |
3 |
20375 |
CRA SR 0602 06.00 |
Bridge Repair |
NEW DECK, CHANGE TO
SEMI-INTREGAL ABUT INCL NEW APPROACH SLAB |
2/1/2008 |
Design Build 1 |
|
$
672,067.00 |
|
2008 |
4 |
23753 |
STA SR 0021 08.98 |
Bridge Repair |
REDECK with Widening AND
PAINTING OF ONE STRUCTURE IN STARK COUNTY ON SR 21. |
10/19/2007 |
Design Build 1 |
|
$
2,448,529.19 |
|
2008 |
6 |
81281 |
FRA IR 71 19.09 |
Noise Wall |
Provide noise barrier walls
along I-71 at various locations as warranted.
Preliminary studies and public involvement will be performed under an
OES task order contract. Construction
will be under a design/build contract. |
6/12/2008 |
Design Build 1 |
|
$
3,129,076.57 |
|
2008 |
8 |
75633 |
CLE SR 32 13.14 |
Bridge Repair |
Bridge rehabilitation project
of twin mainline SR 32 bridges over SR 276.
Bridge Nos. CLE-32-1314 L/R, SFNs:
1300458/1300466, will receive new reinforced concrete decks; have the
structural steel painted; and will receive other minor bridge work. Desig |
10/19/2007 |
Design Build 1 |
|
$
2,244,500.00 |
|
2009 |
2 |
76674 |
LUC IR 75 7.83 Paint Noisewalls |
Noise wall Beautification |
treat rusty spots and repaint
existing noise barriers along both sides of I-75 between I-280 and Michigan
state line; perform necessary related work. |
1/1/2009 |
Design Build 1 |
|
$
2,201,000.00 |
|
2009 |
4 |
25277 |
SUM IR 0077 31.88 |
Bridge Repair |
Re-deck and paint of 8
structures. |
10/1/2008 |
Design Build 1 |
|
$
8,951,000.00 |
|
2009 |
6 |
81547 |
UNI CR 307 4.89 |
Bridge Replacement |
STRUCTURE REPLACEMENT WITH
APPROACH ROADWAY IMPROVEMENTS.LOCAL-LET PROJECT SOLD/ADMINISTERED BY UNI
COUNTY ENGINEER. |
1/1/2009 |
Design Build 1 |
|
$
632,000.00 |
|
2010 |
4 |
25223 |
TRU SR 0011 07.64 |
Bridge Repair |
REMOVE AND REPLACE EXISTING
DECK OF TWO STRUCTURES, TRU-SR11-0959L & TRU-SR11- 0959R. Redeck of
TRU-82-19.54 and TRU-11-9.28.Minor rehabilitation from SLM 7.64 to King
Graves interchange. |
10/1/2009 |
Design Build 1 |
|
$ 10,914,271.00 |
|
2010 |
11 |
78478 |
D11 Sign FY2010 |
Signs |
Upgrade all existing signing
along US 30 & SR 11 including the signing at the interchanges |
10/1/2009 |
Design Build 1 |
|
$
1,728,220.00 |
|
2011 |
8 |
82901 |
PRE CR 24 1.93 |
Bridge Replacement |
1. CR 24 (Camden-College Corner
Road) replace structurally deficient bridgeDesign-build |
10/1/2010 |
Design Build 1 |
|
$
1,159,000.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|